Cam Gordon | Asset Manager – Auckland Transport

Our Agency has two concrete arch diversions dams that we could no longer safely traverse to conduct inspections without engineering a fall protection system. After seeing the capabilities that Niricson could offer for documenting conditions, we decided to move forward.After processing the data, and providing a report of findings, our Agency realized that Niricson provides the opportunity to view the conditions of our downstream dam face that are not physically possible, even with an engineered fall protection system.